Construction services

Driving pile construction

This is a traditional construction method. But there are some limitations of driving piles such as dust, vibration and noise. The advantages are low cost and construction progress quickly.

Pressing pile construction

There are 2 methods of pressing pile construction with counterbalance: Mechanical pressing and self-propelled robot pressing.

Pre-boring pile construction
It is the most advanced method of construction for high-rise building projects downtown area, and  minimizing the impact on neighboring buildings and cost effective.
Bored-pile construction
Supplying materials and constructing bored-piles from 800 to 2500mm diameter, barrett piles, D-wall diaphragm wall.
Cement deep mixing (CDM)
Applying for the weak soil treatment widely and practical effect on the progress to put the transport infrastructure projects into use.
Phan Vu Investment Corporation

Address: No. A2, Truong Son Street, Tan Binh District, HCMC, Vietnam

Email: phanvu@phanvu.com - Phone: +84 (028) 22200884-6 - Fax: +84(028) 22200887

© 2016 PhanVuGroup. All rights reserved.